| Laboratory / Field Test |
|
| Sub-Soil Investigation |
| The foundation or footing is the base of a structure. It is placed on such a level of the soil which can bear the entire load of the constructed structure and other added forces such as horizontal forces due to wind or earth quake. So, appraisal of soil condition is the pre-requisite requirement of a structural design and that can only be achieved through sub-soil investigation. Housing and Building Research Institute is conducting the sub-soil investigation with reputation for about thirty years. It has modest equipments and laboratory facilities to collect soil samples up to 200 feet from the ground level and to conduct the following tests most precisely and efficiently in a reasonable costs. |
| |
|
| |
| Field Tests and Sample Collection |
| |
| Sl. No. |
Description of Items |
Unit |
Rate in Taka |
| 1. |
Preparation, Packing and Transportation of Drilling Equipment from Store to Work Site and Back; |
L.S. |
* |
| 2. |
Installation of Drilling Equipment at Site; |
Each |
2,000.00 |
| 3. |
Installation of Water Supply Arrangement & Minor Repair Works at Site. |
Each |
1,000.00 |
| 4. |
Setting up of Temporary Camping Accommodation for Staff at Site. |
Each |
1,000.00 |
| 5. |
Execution of Boring on Land: |
|
|
| |
a) |
Between |
0 to 50 ft. |
rft. |
40.00 |
| |
b) |
Between |
50 to100 ft. |
rft. |
45.00 |
| |
c) |
Between |
100 to 200 ft. |
rft. |
50.00 |
| |
d) |
Between |
200 to 300 ft. |
rft. |
55.00 |
| |
e) |
Between |
300 to 400 ft. |
rft. |
60.00 |
| |
f) |
Between |
400 to 500 ft. |
rft. |
65.00 |
| 6. |
Making of Platform for Execution of Boring in Water; |
Each |
* |
| 7. |
Idle Time due to Unavailability of Bore Points; |
Day
( 8hrs.) |
500.00 |
| 8. |
Extraction of Disturbed Sample at Identifiable Change of Strata and at Every 5 ft. Interval or More; |
Each |
40.00 |
| 9. |
Extraction of Undisturbed Soil Sample by Shelby Tube; |
Each |
80.00 |
| 10. |
Execution of Standard Penetration Test; |
Each |
40.00 |
| 11. |
Execution of Vane Shear Test. |
Each |
80.00 |
| |
* Actual Cost + 20%. |
|
|
|
| |
| Laboratory Tests and Report Preparation |
| |
| Sl.No. |
Name of the Test |
Rate in Taka
Per Sample |
| 1. |
Specific Gravity; |
60.00 |
| 2. |
Natural Moisture Content; |
30.00 |
| 3. |
Visual Inspection and Classification; |
20.00 |
| 4. |
Sieve Analysis; |
100.00 |
| 5. |
Sieve and Hydrometer Combined Analysis (Including Sp. gr.); |
400.00 |
| 6. |
Unit Weight (Wet & Dry); |
60.00 |
| 7. |
In-situ Density Test; |
500.00 |
| 8. |
Liquid Limit & Plastic Limit; |
100.00 |
| 9. |
Shrinkage Limit; |
80.00 |
| 10. |
Porosity, Void Ratio and Degree of Saturation; |
200.00 |
| 11. |
Uconfined Comprssion Test: |
|
| |
- Uudisturbed
- Remoulded;
|
200.00
150.00 |
| 12. |
Compaction Test: |
|
| |
- Standard AASHO
- Modified AASHO;
|
500.00
500.00 |
| 13. |
Consolidation Test; |
500.00 |
| 14. |
Direct Shear Test; |
300.00 |
| 15. |
Triaxial Shear Test: |
|
| |
- Undrained
- Consolidated Undrained
- Drained;
|
300.00
400.00
600.00 |
| 16. |
Permeability: |
|
| |
- Cohesive
- Non-cohesive;
|
250.00
200.00 |
| 17. |
Preparation of Final Report (Each Set of Report Consisting of Three Copies). |
3,000.00 |
|
| |
|
|
| |
|
|
|
|
 |
|
 |
|
|
|