Soil Test Rate

S.L. no

Name of the Work

Unit

Approved  Rate ( TK) excluding Vat

1

Preparation, Packing and Transportation of Drilling

LS

Actual cost

2

Installation of  Drilling Equipment at side

Each site

               3,500.00

3

Installation of water supply arrangement & minor repair

Each site

               2,700.00

4

Setting up temporary accommodation for staff at site

Each site

               2,600.00

5

Execution of boring : (meter[I1] )

 

 

a)   Between 0 m.  to 15 m.

Per  meter

                 230.00

b)   Between 15 m. to 30 m.

Per  meter

                 270.00

c)   Between 30 m. to  45 m.

Per  meter

                 350.00

6

Making platform for execution of Boring in water

Each

 Actual cost

7

Idle time due to non availability of point

Day (8  hrs)

               3,600.00

8

Collection of Disturbed samples at every 1.50 m.

Each

                 135.00

9

Collection of Undisturbed samples by Shelby tube

Each

                 220.00

10

Execution of Standard Penetration Test :

 

 

a)   Between 0 m.  to 15 m.

Per  meter

                   85.00

b)   Between 15 m. to 30 m.

Per  meter

                 120.00

c)   Between 30 m. to 45 m.

Per  meter

                 140.00

11

Cone Penetration Test

 

 

Between 0 m.  to  15 m.

Per meter

               2,200.00

S.L. no

Name of the Work

Unit

Approved  Rate ( TK) excluding Vat

1

Specific Gravity

Each

               1,600.00

2

Natural Moisture Content

Each

                 850.00

3

Visual Inspection and Classification

Each

                 135.00

4

Sieve Analysis

Each

                 850.00

5

Sieve and Hydrometer Combined Analysis (Including Sp.

Each

               2,200.00

6

Unit Weight (Wet & Dry)

Each

               1,650.00

7

In- situ Density Test(Excluding field visit)

Each

               6,500.00

8

Liquid Limit & Plastic Limit

Each

               3,000.00

9

Shrinkage Limit

Each

               1,400.00

10

Porosity, Void Ratio and Degree of Saturation

Each

               2,700.00

11

Unconfined Compressive Test :

 

 

a)   Undisturbed

Each

               3,400.00

b)   Remolded

Each

               2,600.00

12

Compaction Test :

 

 

a)   Standard AASHO

Each

               5,500.00

b)   Modified AASHO

Each

               6,400.00

13

One Dimensional Consolidation (Full)

Each

             13,500.00

14

One Dimensional  Consolidation Test 

 

 

(e-log p)

Each

             11,200.00

15

Direct Shear Test

Each

               4,300.00

16

Tri axial Shear Test :

 

 

a)   Unconsolidated Undrained

Each

             10,500.00

b)   Consolidated Undrained

Each

             14,500.00

c)   Consolidated Drained

Each

               7,200.00

17

Permeability Test

 

 

a)   Cohesive

Each

             11,000.00

b)   Non-cohesive

Each

               5,200.00

18

Differential Swelling Index

Each

               4,500.00

19

Swelling Potential

Each

               8,300.00

20

Preparation of Final Report (Each set of five copies)

Each set

               5,500.00

 

Location

Housing and Building Research Institute
120/3, Darus-Salam, Mirpur
Dhaka-1216, Bangladesh
Tel +880-2-9035222
Fax +880-2-9035057

csgo depositsiz siteler

 

Contact Persons

Mohammad Abu Sadeque PEng.
Director
HBRI
Email: director@hbri.gov.bd
            hbribd@gmail.com
Phone: 02-9035222
           02-9000821